Engineering glossary

This glossary defines the terms used across the Kitstead Labs guides and tools, in two or three sentences each. It only lists terms that appear on this site, and every entry links to the guide or tool where the term is used, so you can read the full method and the worked example behind it. Entries are in alphabetical order; the topic index below groups them by subject.

Browse by topic

A

Acceleration factor (AF) Reliability

The ratio of the time to failure at the use condition to the time to failure at a harsher test condition, for one failure mechanism under one model; multiplying a test duration by AF gives the use-condition duration the test represents. It converts hours or cycles, not reliability: how many units passed is still the success-run question.

Used in: Accelerated life testing · Acceleration Factor Calculator. See also: Arrhenius model · Peck’s model · Coffin-Manson model · Success-run test · Weibull distribution.

Acceptable quality limit (AQL) Acceptance sampling

The AQL is the process average, in percent nonconforming or nonconformities per hundred units, that a sampling plan treats as acceptable when it is selected. It is an input to the plan look-up together with the lot size and inspection level; it is not a promise about the quality of any single lot, which is what the OC curve describes.

Used in: AQL sampling plans · AQL Sampling Plan calculator. See also: OC curve (operating characteristic curve) · Switching rules.

Acceptance number (Ac) and rejection number (Re) Acceptance sampling

In a single sampling plan, Ac is the largest number of nonconforming units you may find in the sample and still accept the lot, and Re is the count at which you reject it. Under normal and tightened inspection Re = Ac + 1; reduced plans leave a gap between the two, and a count in the gap accepts the lot but sends the next lot back to normal inspection.

Used in: AQL sampling plans · AQL Sampling Plan calculator · Zero acceptance number sampling plans. See also: Acceptable quality limit (AQL) · OC curve (operating characteristic curve).

Acceptance sampling Acceptance sampling

Deciding whether to accept or reject a lot from the inspection of a sample drawn from it. It judges lots after they are made and is a different question from monitoring the process that made them, which is what control charts do.

Used in: AQL sampling plans · Success-run sample size · Which control chart for which data. See also: Control chart · Success-run test.

Activation energy (Ea) Reliability

The parameter of the Arrhenius model, in electronvolts, that sets how strongly a failure mechanism’s rate rises with temperature; it belongs to the mechanism and material, not to the test, and because it sits in the exponent a small error in Ea is a large error in the acceleration factor.

Used in: Accelerated life testing · Acceleration Factor Calculator. See also: Arrhenius model · Acceleration factor (AF).

ANOVA (analysis of variance) Measurement systems

A method that splits the total variation in a set of measurements into parts attributed to identified sources, such as parts, operators and their interaction in a Gage R&R study, or the conditions in a split-lot study. Each source is tested against the error term the model assigns to it: in the crossed Gage R&R design, parts and operators against the part-by-operator interaction, and the interaction against the residual.

Used in: Gage R&R after calibration · Gauge R&R calculator · Split-lot analysis. See also: Gage R&R (GRR) · Welch t-test.

Arrhenius model Reliability

The acceleration model for temperature-driven mechanisms, AF = exp[(Ea/k)(1/T_use − 1/T_stress)] with the temperatures in kelvin and k the Boltzmann constant in eV/K; the ratio form cancels the unknown pre-exponential constant, so only the activation energy and the two temperatures are needed.

Used in: Accelerated life testing · Acceleration Factor Calculator. See also: Activation energy (Ea) · Acceleration factor (AF) · Peck’s model.

Attribute agreement Measurement systems

A study for a pass/fail inspection: known parts are judged more than once by each inspector, and the judgments are compared with each other and with a reference decision. It is reported as percent agreement within an inspector, between inspectors and against the reference, and as Cohen’s kappa, which discounts the agreement that chance alone would produce; the direction of the disagreements (fails called pass, or passes called fail) matters as much as the rate.

Used in: Measurement system analysis · Attribute Agreement Analysis (Kappa) · Attribute agreement study design. See also: Gage R&R (GRR) · Repeatability and reproducibility.

B

B10 life Reliability

The time by which 10 % of a population is expected to have failed, read from a fitted life distribution; for a Weibull fit B10 = η·(−ln 0.9)^(1/β). Other percentiles are written the same way (B1, B50); the low ones sit far from the data and are the most sensitive to the fitting method and the sample size.

Used in: Weibull analysis for engineers · Weibull Analysis Calculator. See also: Weibull distribution · Characteristic life (η) · Reliability (R).

Bias Measurement systems

The difference between the mean of repeated readings on a reference and the reference’s accepted value. Calibration adjusts it at the calibration points; a bias study after calibration measures what the procedure left behind, and a t test on the readings says whether the residual is real or scatter.

Used in: Measurement system analysis · Gage R&R after calibration. See also: Calibration · Linearity · Stability.

Blocking Experimental design

Grouping experimental runs so that a known nuisance source of variation, such as the wafer lot or the day, is the same within a block and differs only between blocks. The comparison of interest is then made inside each block, and the block-to-block difference is removed from the error instead of hiding the effect.

Used in: Experimental design · Split-lot analysis. See also: Randomization · Replication.

Box-Cox transformation Process capability

A power transformation of positive readings, x(λ) = (x^λ − 1)/λ, with ln x when λ = 0, used to bring skewed data close to a normal shape. λ is estimated from the data, by maximum likelihood or by a criterion specific to the software, and the specification limit is transformed with the readings before an index is computed. The index can change markedly with λ, so a capability report should state the value used.

Used in: Process capability for non-normal data. See also: Pp and Ppk · Specification limits.

C

c chart SPC

An attributes control chart for the number of defects counted on a unit of fixed size, such as voids per wafer, where one unit can carry several defects. The count is modelled as Poisson, so the limits are c̄ ± 3√c̄; when the inspected size varies from unit to unit, the u chart is used instead.

Used in: Which control chart for which data · Attribute Control Chart Calculator. See also: u chart · p chart.

Calibration Measurement systems

Comparing a measuring instrument with a reference of known value and correcting its bias. Calibration fixes where the instrument reads on average; it says nothing about how much the readings scatter, which is what a Gage R&R study measures, so calibration comes first and GRR follows.

Used in: Gage R&R after calibration · Measurement system analysis. See also: Gage R&R (GRR).

Calibration curve Electroplating

A line fitted to measured thickness against plating time for coupons plated at one current density. Its slope is the deposition rate the bath delivers, its intercept absorbs a seed layer or an initiation delay, and its residual scatter is compared with the thickness gauge’s repeatability; the slope divided by the Faraday rate is the current efficiency.

Used in: Plating rate calibration · Plating Rate and Efficiency Calculator. See also: Deposition rate · Current efficiency · Faraday’s law.

Censored data Reliability

Life-test records in which some units have not failed by the time their observation ends: a unit removed unfailed or still running at the end of the test is a suspension, and its time is a lower bound on its life rather than a failure time. Suspensions carry information and must stay in the analysis; a Weibull fit uses them through adjusted ranks or through the likelihood.

Used in: Weibull analysis for engineers · Weibull Analysis Calculator. See also: Median rank · Weibull distribution.

Characteristic life (η) Reliability

The scale parameter of a Weibull distribution: the time by which 63.2 % of units have failed, whatever the shape, because F(η) = 1 − e⁻¹. It is not the mean life, which is η·Γ(1 + 1/β), and on a Weibull probability plot it is where the fitted line crosses 63.2 %.

Used in: Weibull analysis for engineers · Weibull Analysis Calculator. See also: Shape parameter (β) · Weibull distribution · MTTF.

Chi-square distribution Statistics

For n independent readings from the same normal population, (n − 1)s²/σ² follows the chi-square distribution with n − 1 degrees of freedom. It is bounded at zero and skewed to the right, so a confidence interval for σ is not symmetric about s; its critical values also serve goodness-of-fit and contingency tests.

Used in: Z, t and chi-square tables. See also: Degrees of freedom · Confidence interval.

Coffin-Manson model Reliability

The relation used for thermal-cycling fatigue, in which the acceleration factor is the ratio of the temperature swings of the test cycle and the field cycle raised to an exponent, AF = (ΔT_stress/ΔT_use)^m; it compares cycles, not hours, and in this simple form ignores dwell time, ramp rate and the cycle’s mean temperature.

Used in: Accelerated life testing · Acceleration Factor Calculator. See also: Acceleration factor (AF) · Arrhenius model.

Cohen’s kappa Measurement systems

Agreement between two sets of pass/fail judgments corrected for chance: κ = (pₒ − pₑ)/(1 − pₑ), where pₒ is the share of pairs that agree and pₑ the share expected if each side judged at random with its own pass and fail proportions. A κ of 1 is perfect agreement and 0 is what chance alone gives; it is undefined when every judgment on both sides is the same category.

Used in: Measurement system analysis · Attribute Agreement Analysis (Kappa) · Attribute agreement study design. See also: Attribute agreement · Repeatability and reproducibility.

Common-cause variation SPC

The variation that is present all the time because of the many small sources built into the process, as opposed to a change from an identifiable cause. Control limits are computed from common-cause variation, so a point beyond them or a pattern that the run rules flag is evidence that something else has entered the process.

Used in: Which control chart for which data · Control chart constants. See also: Control limits · Run rules.

Confidence interval Statistics

A range computed from a sample that, with a stated confidence level such as 95 %, covers the true value of a parameter such as a mean or a standard deviation. Its width depends on the sample size, the spread of the data and the critical value taken from the t, chi-square or normal table; a wider interval is the price of fewer readings.

Used in: Z, t and chi-square tables · Cpk confidence intervals · Tolerance intervals for normal data. See also: Degrees of freedom · t distribution · Chi-square distribution · Confidence level (C) · Tolerance interval.

Confidence level (C) Reliability

In a success-run test, the confidence level is the probability statement attached to the claim: after n units pass without failure, you may state with confidence C that the reliability is at least R. Raising C or R raises the number of units required.

Used in: Success-run sample size · Success-Run Sample Size calculator. See also: Reliability (R) · Success-run test.

Containment Problem solving

The immediate actions that stop a known problem from reaching the customer while the cause is still being found, such as holding shipments, sorting stock or adding an inspection. Containment is step D3 of an 8D and is temporary by definition; it is removed once the permanent action has been verified.

Used in: 8D report · Root cause analysis. See also: Eight disciplines (8D) · Root cause.

Control chart SPC

A time-ordered plot of a statistic with a centre line and control limits computed from the process’s own short-term variation. The chart type depends on how the data arrive: individual measurements, rational subgroups, counts of defective units or counts of defects.

Used in: Which control chart for which data · I-MR control charts. See also: Control limits · I-MR chart · X̄-R chart.

Control chart constants SPC

The factors d₂, d₃, c₄, A₂, A₃, D₃, D₄, B₃, B₄ and E₂ that turn an average range or standard deviation into control limits. They depend only on the subgroup size n: d₂ and d₃ are the mean and standard deviation of the range of n normal values, c₄ is the mean of their sample standard deviation, and the rest are short formulas in those three.

Used in: Control chart constants. See also: Subgroup size (n) · X̄-R chart · X̄-s chart.

Control limits SPC

The lines on a control chart, usually three standard deviations of the plotted statistic on each side of the centre line, that separate common-cause variation from signals. They describe what the process does, not what it is required to do; the requirement is the specification limit, and the two must never be drawn as if they were the same thing.

Used in: I-MR control charts · Which control chart for which data · Control chart constants · I-MR Control Chart Calculator · Subgroup Control Chart Calculator · Attribute Control Chart Calculator. See also: Specification limits · Common-cause variation.

Cp and Cpk Process capability

Capability indices computed from the within-process standard deviation. Cp compares the specification width with six sigma; Cpk takes the smaller of the two one-sided distances from the mean to a specification limit, divided by three sigma, so it also reflects how well the process is centred. Both are meaningful only after a control chart has shown the process to be stable.

Used in: Cpk vs Ppk · Process Capability Calculator · Cpk confidence intervals. See also: Pp and Ppk · Within sigma.

Current density Electroplating

The electric current per unit of plated area, usually in amperes per square decimetre (A/dm²) or per square foot (A/ft²). Together with the area it gives the total current, and together with the current efficiency it sets the deposition rate, so it is the first input of a plating-time estimate.

Used in: Faraday’s law · Unit converter · Process window · Plating rate calibration · Plating Rate and Efficiency Calculator. See also: Faraday’s law · Current efficiency.

Current efficiency Electroplating

The fraction of the charge passed that actually deposits the intended metal, the rest going to side reactions such as hydrogen evolution. Faraday’s law gives the theoretical mass for 100 % efficiency; the real deposit is that mass times the efficiency, which must be measured on the bath, not assumed.

Used in: Faraday’s law · Plating rate calibration · Plating Rate and Efficiency Calculator. See also: Faraday’s law · Current density.

D

Degrees of freedom Statistics

The number of independent pieces of information behind an estimate of variation: n readings give n − 1 degrees of freedom for the sample standard deviation, because the mean has used one. The t and chi-square tables are entered by degrees of freedom, not by n, and reading the row for n instead of n − 1 gives limits that are too tight.

Used in: Z, t and chi-square tables · Split-lot analysis · Cpk confidence intervals. See also: t distribution · Chi-square distribution · ANOVA (analysis of variance).

Deposition rate Electroplating

Thickness plated per unit time at a given current density, in µm/min. Faraday’s law gives the rate at 100 % current efficiency; the measured rate from a calibration curve is lower by the efficiency, and it is the measured rate that sets the plating time.

Used in: Plating rate calibration · Plating Rate and Efficiency Calculator. See also: Calibration curve · Current efficiency · Current density.

Designed experiment (DOE) Experimental design

An experiment in which the factors and their levels are chosen in advance and the runs are arranged so that each effect can be estimated separately from the others and from noise. The design follows from the question and the constraints, such as how many wafers can be spent, not from a list of factors.

Used in: Experimental design · DOE interaction effects. See also: Factor, level and response · Interaction · Replication.

DFMEA (design failure mode and effects analysis) Problem solving

A worksheet that, for each function of a product, lists how the design could fail to deliver it in use, why, and with what effect for the user, rates each failure for severity, occurrence and detection by the applicable method, and turns the highest-rated items into design actions with evidence. It analyses the part as drawn; a part made off-drawing is a process failure for the PFMEA. Its second output is the list of special characteristics the design depends on.

Used in: DFMEA practical guide. See also: PFMEA (process failure mode and effects analysis) · Special characteristic · Failure mode, cause and effect.

DPMO Process capability

Defects per million opportunities: the number of defects divided by the number of units inspected times the opportunities per unit, scaled to a million. It counts defects, not defective units, so a unit with three defects contributes three, and it depends on how many opportunities each unit is said to have; that definition must be fixed before the data are collected and kept the same in every comparison.

Used in: DPMO and Sigma Level Calculator · Z, t and chi-square tables · Sigma level and the 1.5σ shift. See also: Sigma level · Cp and Cpk.

E

Eight disciplines (8D) Problem solving

A customer-facing problem-solving format with numbered steps from D0 (prepare) through D3 (contain the problem), D4 (find the root causes), D5 (choose and verify permanent actions) and D6 (implement and validate) to D8 (close and recognize). Each step has a required output and a typical reason for which customers reject the report.

Used in: 8D report. See also: Containment · Root cause.

Equipment states (six) Equipment efficiency

The six categories into which all of a tool’s time is sorted for OEE: non-scheduled, unscheduled downtime, scheduled downtime, engineering, standby and productive. Total time is all six together; uptime is engineering, standby and productive; downtime is the two downtime states.

Used in: OEE equipment states · OEE Calculator. See also: OEE (overall equipment effectiveness) · OEE factors (AE, OE, RE, QE).

Experimental unit Experimental design

The smallest entity to which a treatment is applied independently, such as a wafer that receives one process condition. The number of experimental units, not the number of measurements taken on them, is what counts as replication; many sites measured on one wafer are one unit, not many.

Used in: Split-lot analysis · DOE interaction effects. See also: Replication · Split-lot.

F

Factor, level and response Experimental design

A factor is an input the experiment deliberately changes, a level is one of the settings it is given, and the response is the measured output used to judge the effect. Choosing the response first, then the factors and levels, keeps the experiment tied to the engineering question.

Used in: Experimental design · DOE interaction effects. See also: Designed experiment (DOE) · Main effect.

Failure mode, cause and effect Problem solving

In an FMEA, the failure mode is how a design or a process step can fail to meet its requirement, the cause is why that failure happens, and the effect is what the failure does downstream or to the user. Keeping the three separate is what makes the worksheet usable; a recipe setting written as the failure mode, for example, is a cause in disguise.

Used in: PFMEA practical guide · DFMEA practical guide. See also: PFMEA (process failure mode and effects analysis) · Severity, occurrence and detection.

Faraday’s law Electroplating

The relation between the charge passed through a plating cell and the mass of metal deposited: mass equals charge times molar mass, divided by the electron count and the Faraday constant, times the current efficiency. Density turns the mass into a volume, geometry turns the volume into a thickness, and current turns the charge into a time.

Used in: Faraday’s law · Unit converter · Plating rate calibration · Plating Rate and Efficiency Calculator. See also: Current efficiency · Current density.

Fishbone diagram Problem solving

A cause-and-effect diagram that organizes candidate causes of a problem under branches such as machine, material, method and measurement. It is a way to list and group candidates before testing them; it does not rank them, and a cause on the diagram is not a root cause until data have verified it.

Used in: Root cause analysis. See also: 5 Why · Root cause · Stratification.

5 Why Problem solving

Asking "why" repeatedly, following the physical mechanism from the symptom back to a cause that can be acted on. The chain stops at something the team can change and verify, not at a general statement; each link should be checkable against data.

Used in: Root cause analysis. See also: Fishbone diagram · Root cause.

G

Gage R&R (GRR) Measurement systems

A study of how much of the observed variation comes from the measurement system rather than from the parts, split into repeatability and reproducibility. The guide and calculator use the ANOVA method and report %GRR, the GRR standard deviation as a percentage of the total variation, %Tolerance, six times the GRR standard deviation as a percentage of the specification width, and ndc.

Used in: Gage R&R after calibration · Gauge R&R calculator · Measurement system analysis. See also: Repeatability and reproducibility · ndc (number of distinct categories) · Calibration.

H

Hazard rate Reliability

The instantaneous failure rate of the units still surviving at time t, h(t) = f(t)/R(t). For a Weibull distribution h(t) = (β/η)(t/η)^(β−1): falling when β < 1, constant when β = 1 and rising when β > 1, which is why the shape parameter is read as a diagnosis of the failure mechanism.

Used in: Weibull analysis for engineers. See also: Shape parameter (β) · Weibull distribution.

I

I-MR chart SPC

The Individuals and Moving Range chart, for data that arrive one value at a time, such as one titration per shift. The individuals chart has limits at the mean ± 3 × MR̄/1.128, that is 2.66 times the average moving range, and the moving range chart has an upper limit of 3.267 times the average moving range and no lower limit.

Used in: I-MR control charts · Which control chart for which data · I-MR Control Chart Calculator. See also: Moving range (MR) · Control chart constants.

Interaction Experimental design

Two factors interact when the effect of one depends on the level of the other, so that the main effects alone describe the response wrongly. A replicated factorial design can estimate the interaction; an experiment that changes one factor at a time cannot see it at all.

Used in: DOE interaction effects · Experimental design. See also: Main effect · Designed experiment (DOE).

L

Laney p′ chart SPC

An attributes control chart for the fraction defective that widens or narrows the p chart's limits by σz, the spread of the points' z-scores measured with a moving range: the limits are p̄ ± 3σz√(p̄(1 − p̄)/nᵢ). With σz = 1 it is the p chart, and with equal sample sizes it gives the limits of an individuals chart on the fractions. The Laney u′ chart makes the same adjustment to the u chart.

Used in: Overdispersion in p and u charts. See also: Overdispersion · p chart · u chart.

Linearity Measurement systems

How the bias of a gauge changes across its measuring range, estimated by measuring several references spread over the range and regressing bias on reference value. A single-point calibration cannot remove a linearity error; its usual causes are a scale factor, a reference that is not what its certificate says, or a probe that loads features differently.

Used in: Measurement system analysis · Gage R&R after calibration. See also: Bias · Calibration.

LTPD (lot tolerance percent defective) Acceptance sampling

The lot quality, in percent nonconforming, that a sampling plan accepts only rarely, conventionally with a 10 % probability of acceptance. It is read from the OC curve and describes the consumer’s risk side of the plan, the side the AQL says nothing about.

Used in: AQL sampling plans · AQL Sampling Plan calculator · Zero acceptance number sampling plans. See also: OC curve (operating characteristic curve) · Acceptable quality limit (AQL).

M

Main effect Experimental design

The average change in the response when a factor moves from one level to another, averaged over the levels of the other factors. It is the right summary only when the factors do not interact; with an interaction present, the effect of one factor must be reported at each level of the other.

Used in: DOE interaction effects. See also: Interaction · Factor, level and response.

Median rank Reliability

The plotting position given to the i-th of n ordered failures on probability paper, usually by Benard’s approximation F = (i − 0.3)/(n + 0.4). When suspensions are present the integer i is replaced by Johnson’s adjusted rank, which grows by slightly more than one across each suspension.

Used in: Weibull analysis for engineers · Weibull Analysis Calculator. See also: Censored data · Weibull distribution.

Moving range (MR) SPC

The absolute difference between two consecutive individual values, MRᵢ = |xᵢ − xᵢ₋₁|. Its average, divided by d₂ = 1.128, estimates the short-term standard deviation when the data come one at a time, which is how both the I-MR chart and the within-process sigma of the capability calculator are built.

Used in: I-MR control charts · Control chart constants · Process Capability Calculator · I-MR Control Chart Calculator. See also: I-MR chart · Within sigma.

MTTF Reliability

Mean time to failure: the expected life of a unit under the fitted distribution. For a Weibull fit MTTF = η·Γ(1 + 1/β), below the characteristic life when β > 1 and above it when β < 1; for an exponential distribution (β = 1) it equals η.

Used in: Weibull analysis for engineers · Weibull Analysis Calculator. See also: Characteristic life (η) · Weibull distribution.

N

ndc (number of distinct categories) Measurement systems

An estimate of how many groups of parts a measurement system can tell apart within the range of the study samples, computed as 1.41 times the part standard deviation divided by the GRR standard deviation and truncated to an integer. It depends on the parts chosen for the study, so a study on parts that span a narrow range gives a low ndc even for a good instrument.

Used in: Gage R&R after calibration · Gauge R&R calculator · Measurement system analysis. See also: Gage R&R (GRR).

np chart SPC

An attributes control chart for the number of defective units in samples of constant size. It is the p chart with the count plotted instead of the fraction, and it uses the same binomial model.

Used in: Which control chart for which data · Attribute Control Chart Calculator. See also: p chart · c chart.

O

OC curve (operating characteristic curve) Acceptance sampling

The curve that gives, for a sampling plan, the probability of accepting a lot as a function of the lot’s actual percent nonconforming. It is the honest description of what a plan does: the AQL sits near the top of the curve and the LTPD near the bottom.

Used in: AQL sampling plans · AQL Sampling Plan calculator · Zero acceptance number sampling plans. See also: Acceptable quality limit (AQL) · LTPD (lot tolerance percent defective).

OEE (overall equipment effectiveness) Equipment efficiency

The share of total time in which a tool was making good units at its ideal rate, calculated as the product of the four factors AE × OE × RE × QE. Its purpose is to put the losses in order so that the largest one is attacked first, not to produce a single score.

Used in: OEE equipment states · OEE Calculator. See also: Equipment states (six) · OEE factors (AE, OE, RE, QE).

OEE factors (AE, OE, RE, QE) Equipment efficiency

Availability efficiency (AE) is uptime over total time; operational efficiency (OE) is productive time over uptime; rate efficiency (RE) compares the actual production rate with the ideal rate; quality efficiency (QE) is good units over all units. In the three-factor form, availability = AE × OE, performance = RE and quality = QE.

Used in: OEE equipment states · OEE Calculator. See also: OEE (overall equipment effectiveness) · Equipment states (six).

Overall sigma Process capability

The sample standard deviation of all readings taken together, with n − 1 in the denominator. It includes drift and shifts between subgroups as well as the short-term variation, so it is the sigma behind Pp and Ppk, and the gap between it and the within sigma shows how much shift and drift between subgroups the data contain.

Used in: Cpk vs Ppk · Process Capability Calculator · Sigma level and the 1.5σ shift. See also: Within sigma · Pp and Ppk.

Overdispersion SPC

More variation between samples than the binomial model of a p chart, or the Poisson model of a c or u chart, allows, usually because the true rate itself varies from day to day or lot to lot. With large samples it can put ordinary points outside the limits; a σz above 1 in the Laney calculation, or Minitab's P Chart Diagnostic (the U Chart Diagnostic for defects data), shows it.

Used in: Overdispersion in p and u charts. See also: Laney p′ chart · p chart · u chart.

P

p chart SPC

An attributes control chart for the fraction of defective units in a sample, where each unit is either defective or not. The count follows a binomial model, so the limits are p̄ ± 3√(p̄(1 − p̄)/n) and move with the sample size; when every sample has the same size the np chart is equivalent.

Used in: Which control chart for which data · Attribute Control Chart Calculator · Overdispersion in p and u charts. See also: np chart · c chart.

Peck’s model Reliability

The acceleration model for moisture-driven failure of plastic-encapsulated parts: an Arrhenius temperature term multiplied by a humidity term, AF = (RH_stress/RH_use)^n · exp[(Ea/k)(1/T_use − 1/T_stress)], with relative humidity in percent; the exponent n and the activation energy are fitted together and should come from the same source.

Used in: Accelerated life testing · Acceleration Factor Calculator. See also: Arrhenius model · Acceleration factor (AF).

PFMEA (process failure mode and effects analysis) Problem solving

A worksheet that, for each process step, lists how the step can fail, why, and with what effect, rates each failure for severity, occurrence and detection by the applicable method, and turns the highest-rated items into actions with evidence. It describes the controls that actually exist, not the ones the team intends to add.

Used in: PFMEA practical guide · DFMEA practical guide. See also: Failure mode, cause and effect · Severity, occurrence and detection · DFMEA (design failure mode and effects analysis).

Pp and Ppk Process capability

Performance indices with the same formulas as Cp and Cpk but computed from the overall standard deviation of all readings, which includes any drift or shift between subgroups. When Ppk is clearly below Cpk, the readings contain variation that the within-subgroup estimate does not see, and the sequence of readings should be examined before either index is quoted.

Used in: Cpk vs Ppk · Process Capability Calculator · Cpk confidence intervals · Process capability for non-normal data. See also: Cp and Cpk · Overall sigma · Box-Cox transformation.

Process window Process capability

The range of process inputs, such as current density and time, within which the output has been shown to meet its specification. The window is drawn from experimental evidence, not derived from the specification by arithmetic; it is rarely a rectangle, it needs margin, and being inside it is not the same as being capable.

Used in: Process window · Experimental design. See also: Specification limits · Cp and Cpk.

R

Randomization Experimental design

Running the experimental conditions in a random order so that slow drifts, warm-up effects or the order of wafers in a lot cannot line up with one factor and masquerade as its effect. It protects the comparison; blocking removes known nuisance sources, randomization spreads the unknown ones.

Used in: Experimental design · Split-lot analysis. See also: Blocking · Replication.

Rational subgroup SPC

A small group of measurements taken under the same conditions and close together in time, such as five pillars from one wafer, so that the variation inside the group is common-cause variation only. The subgroup range or standard deviation then estimates the short-term sigma, and shifts between subgroups show up on the X̄ chart.

Used in: Which control chart for which data · Cpk vs Ppk · I-MR control charts · Rational subgrouping. See also: Subgroup size (n) · X̄-R chart · Within sigma.

Reliability (R) Reliability

The probability that a unit survives the test or the service condition in question. In a success-run test it is the lower bound demonstrated when all n units pass, stated together with a confidence level; the usual 90/90 statement means R ≥ 0.90 with C = 0.90 and needs 22 units.

Used in: Success-run sample size · Success-Run Sample Size calculator. See also: Confidence level (C) · Success-run test · Weibull distribution.

Repeatability and reproducibility Measurement systems

Repeatability is the variation seen when one operator measures the same part several times with the same instrument; reproducibility is the additional variation between operators (or sessions) measuring the same parts. Together they form the GRR variation, and the split tells you whether to work on the instrument or on the operators.

Used in: Gage R&R after calibration · Gauge R&R calculator · Measurement system analysis. See also: Gage R&R (GRR) · ANOVA (analysis of variance).

Replication Experimental design

Running the same condition on more than one experimental unit so that the run-to-run variation can be estimated and compared with the effects. Measuring one unit many times is repeated measurement, not replication; it estimates measurement noise, not process variation.

Used in: Experimental design · DOE interaction effects · Split-lot analysis. See also: Experimental unit · Randomization.

Root cause Problem solving

The cause that, when removed or controlled, prevents the problem from recurring, as opposed to a symptom or an intermediate link in the chain. A candidate becomes a root cause only when it has been verified against data, for example by reproducing the problem or by showing that the stratified data line up with it.

Used in: Root cause analysis · 8D report. See also: 5 Why · Fishbone diagram · Stratification.

Run rules SPC

Tests applied to the sequence of points on a control chart in addition to the single-point rule, such as a run of consecutive points on one side of the centre line. They detect shifts and trends that keep every point inside the limits, and they are how a range chart with a lower limit of zero can still show a reduction in variation.

Used in: Which control chart for which data · Control chart constants · Control chart run rules. See also: Control limits · Common-cause variation.

S

Severity, occurrence and detection Problem solving

The three ratings given to each failure in an FMEA: how serious the effect is, how often the cause is expected to produce the failure, and how likely the existing controls are to catch it before it reaches the customer. Each rating needs evidence, and the method for combining them (a risk priority number or an action priority table) is the one the applicable standard or customer requires.

Used in: PFMEA practical guide · DFMEA practical guide. See also: PFMEA (process failure mode and effects analysis) · Failure mode, cause and effect.

Shape parameter (β) Reliability

The exponent of the Weibull distribution and the slope of the fitted line on a Weibull probability plot. It says how the failure rate changes with age: β < 1 falling (early failures), β ≈ 1 constant (random failures), β > 1 rising (wear-out). It belongs to the failure mechanism, and two mechanisms mixed in one data set can produce a bent plot, although a small sample may not show it.

Used in: Weibull analysis for engineers · Weibull Analysis Calculator. See also: Hazard rate · Characteristic life (η) · Weibull distribution.

Sigma level Process capability

The standard normal quantile whose upper tail equals the defect rate per opportunity, plus the conventional 1.5σ shift: 3.4 DPMO corresponds to a sigma level of 6.00, or a Z of 4.50 without the shift. A report should say which of the two it quotes. With no defects observed, the data give only a lower bound, so no sigma level is defined.

Used in: DPMO and Sigma Level Calculator · Z, t and chi-square tables · Sigma level and the 1.5σ shift. See also: DPMO · Specification limits.

Special characteristic Problem solving

A product or process characteristic that the design analysis shows a failure depends on, so that its requirement is carried from the DFMEA into the PFMEA and the control plan. Naming it is what tells the process team which of the dimensions on the drawing must be protected.

Used in: DFMEA practical guide. See also: DFMEA (design failure mode and effects analysis) · Specification limits.

Specification limits Process capability

The values the product must meet, set by the customer, the design or the next process step. They apply to individual units and define what is acceptable; they are not control limits, which describe how the process behaves, and placing them on a control chart invites the wrong decisions.

Used in: Cpk vs Ppk · I-MR control charts · Process window · Process Capability Calculator. See also: Control limits · Process window.

Split-lot Experimental design

An experiment in which one lot of wafers is divided into groups that receive different process conditions, so that the groups share the same incoming material and history. The analysis compares the groups with a Welch t-test for two conditions or a one-way ANOVA followed by Tukey–Kramer comparisons for three or more.

Used in: Split-lot analysis · Experimental design. See also: Welch t-test · Tukey–Kramer comparisons · Experimental unit.

Stability Measurement systems

Whether the bias of a gauge stays constant over time, checked by measuring one reference on a schedule and plotting the readings on an individuals and moving range chart with limits from the gauge’s own moving ranges, not from the product tolerance. It is the one measurement study that runs continuously and catches a drift before the next calibration does.

Used in: Measurement system analysis · Gage R&R after calibration. See also: Bias · Control chart · Calibration.

Stratification Problem solving

Splitting the data on a problem by a candidate variable, such as machine, shift, lot or site, to see whether the problem concentrates in some strata. It is done before brainstorming causes, because a stratification that shows a clear concentration narrows the search more than any list of possibilities.

Used in: Root cause analysis. See also: Fishbone diagram · Root cause.

Subgroup size (n) SPC

The number of measurements inside one subgroup of a control chart, such as four sites on a panel, not the number of subgroups collected. It selects the row of the control chart constants, and using the number of subgroups instead is the most common reason for limits that are far too tight.

Used in: Control chart constants · Which control chart for which data · Subgroup Control Chart Calculator. See also: Control chart constants · Rational subgroup.

Success-run test Reliability

A test (also called the success-run theorem) in which n units are put through the test condition and all must pass. If they do, the reliability is at least R with confidence C, where n = ln(1 − C)/ln(R), rounded up; the test proves a lower bound, and with fewer units than the formula asks for, a passed test still demonstrates a lower reliability or confidence, which the guide works out backward from the units you have.

Used in: Success-run sample size · Success-Run Sample Size calculator. See also: Reliability (R) · Confidence level (C) · Acceptance sampling · Acceleration factor (AF) · B10 life.

Switching rules Acceptance sampling

The rules that move a sampling scheme between normal, tightened and reduced inspection according to the recent history of accepted and rejected lots. Tightened inspection protects the consumer after rejections; reduced inspection rewards a run of accepted lots with a smaller sample; the scheme’s protection comes from the rules, not from any one plan.

Used in: AQL sampling plans · AQL Sampling Plan calculator. See also: Acceptable quality limit (AQL) · OC curve (operating characteristic curve).

T

t distribution Statistics

The distribution of (x̄ − µ)/(s/√n) for n independent readings from the same normal population, with n − 1 degrees of freedom when σ is estimated by s from those readings; it has heavier tails than the normal distribution and approaches it as the degrees of freedom grow. Its critical values set confidence intervals for a mean and the t-tests that compare two means, including the Welch test.

Used in: Z, t and chi-square tables. See also: Welch t-test · Degrees of freedom · Confidence interval.

Tolerance interval Statistics

A range computed from a sample that, with a stated confidence level, contains at least a stated proportion of the individual values of a population; a 95/95 interval covers at least 95 % of the units with 95 % confidence. For normal readings its limits are the sample mean plus or minus a factor k times the sample standard deviation, where k depends on the sample size, the proportion and the confidence level. A confidence interval narrows toward a single value as the sample grows; a tolerance interval narrows toward the range that holds the stated proportion.

Used in: Tolerance intervals for normal data. See also: Confidence interval · Confidence level (C) · Reliability (R).

Tukey–Kramer comparisons Experimental design

Pairwise comparisons made after a one-way ANOVA has found a difference among three or more conditions, adjusted so that the chance of a false positive across all the pairs stays at the chosen level. They answer the question the ANOVA leaves open: which conditions differ from which.

Used in: Split-lot analysis. See also: ANOVA (analysis of variance) · Split-lot.

U

u chart SPC

An attributes control chart for defects per unit when the inspected size varies from sample to sample, such as defects per square centimetre on wafers of different inspected areas. The count is divided by the size, and the limits ū ± 3√(ū/nᵢ) change with each point.

Used in: Which control chart for which data · Attribute Control Chart Calculator · Overdispersion in p and u charts. See also: c chart · p chart.

W

Weibull distribution Reliability

A two-parameter life distribution, R(t) = exp[−(t/η)^β], that covers falling, constant and rising failure rates through its shape β and sets the time scale through its characteristic life η. It is fitted to failure times and suspensions by rank regression on a probability plot or by maximum likelihood, and read off as B-lives, MTTF and R(t).

Used in: Weibull analysis for engineers · Weibull Analysis Calculator · Process capability for non-normal data. See also: Shape parameter (β) · Characteristic life (η) · B10 life · Censored data.

Welch t-test Experimental design

A two-sample t-test that compares the means of two conditions without assuming that the two groups have the same variance. It is the comparison used for a split-lot study with exactly two observed levels; with three or more, a one-way ANOVA is used instead.

Used in: Split-lot analysis · Z, t and chi-square tables. See also: ANOVA (analysis of variance) · Split-lot · t distribution.

Within sigma Process capability

The short-term standard deviation estimated from variation inside subgroups or between consecutive readings, such as the average range divided by d₂ or the average moving range divided by 1.128. It is the sigma behind control limits and behind Cp and Cpk, and it excludes shifts between subgroups by construction.

Used in: Cpk vs Ppk · Process Capability Calculator · Control chart constants · Sigma level and the 1.5σ shift. See also: Overall sigma · Moving range (MR) · Cp and Cpk.

X

X̄-R chart SPC

The pair of charts for rational subgroups of two to about ten values: the X̄ chart plots subgroup means with limits X̿ ± A₂R̄, and the R chart plots subgroup ranges with limits D₃R̄ and D₄R̄. The mean of n values varies √n times less than one value, which is why the X̄ chart can see a small shift that an individuals chart would miss.

Used in: Which control chart for which data · Control chart constants · Subgroup Control Chart Calculator · Rational subgrouping. See also: Rational subgroup · Control chart constants · X̄-s chart.

X̄-s chart SPC

The same pair of charts with the subgroup standard deviation in place of the range: X̄ limits X̿ ± A₃s̄ and s limits B₃s̄ and B₄s̄. It is preferred for larger subgroups, roughly n above 10, and when the subgroup size varies; for small n it gives almost the same limits as the X̄-R chart.

Used in: Control chart constants · Subgroup Control Chart Calculator. See also: X̄-R chart · Control chart constants.