Quick answer
Faraday's law gives the thickness a current density would deposit at 100 % current efficiency. The bath never delivers 100 %, and the shortfall is not a constant you can look up: it depends on the bath, the additives, the current density and the age of the solution. A plating rate calibration measures it. Plate several coupons for different times at the current density you will use, measure their thickness, fit a straight line of thickness against time, and read three things from the line: the deposition rate (the slope), the current efficiency (the slope divided by the Faraday rate) and the time a target thickness will take.
The Plating Rate and Efficiency Calculator does the fit and the efficiency arithmetic from a pasted table. This guide explains what the experiment has to look like for the numbers to mean something, works one synthetic calibration through by hand, and shows how to put an uncertainty on the slope with the t table.
About the example. All numbers in this article are fictional. The bath plates copper at 2 A/dm², the same current density as the Faraday guide's example, with the same constants (M = 0.063546 kg/mol, z = 2, F = 96485.33212 C/mol, ρ = 8960 kg/m³). Twelve coupons, two per time, is a minimal teaching layout; a real calibration follows your own procedure. All arithmetic is carried at full precision and rounded at the end, so recomputing a step from the rounded numbers printed here can differ in the last digit.
What the theoretical rate is, and why it is an upper bound
At 100 % efficiency a current density J deposits copper at a rate
b_theory = J·M / (z·F·ρ)
which for J = 2 A/dm² = 200 A/m² gives 7.35 × 10⁻⁹ m/s, or 0.441 µm/min. The derivation is in the Faraday guide. Every ampere that goes into a competing reaction at the cathode, hydrogen evolution or the reduction of an additive, is an ampere that deposits no copper, so the real rate is this number times the current efficiency η, and η is below 1. The calibration measures b, the real rate; η = b / b_theory follows.
Designing the coupon run
The fit is only as good as the coupons. Four things decide whether the slope means what you want it to mean.
| Design choice | What to do | Why |
|---|---|---|
| One current density | Plate every coupon at the J you will use in production | b_theory is proportional to J; coupons at different densities belong to different lines |
| Several times | Spread the times over the range you care about, with at least three distinct times and preferably two coupons at each | A slope needs spread in time; replicates show the scatter at each time, which is what the residual standard deviation estimates |
| Same measurement | Measure every coupon the same way at the same spot | A thickness gauge that reads high makes the slope read high and the efficiency with it; see the Measurement system analysis guide |
| Same bath state | Run the coupons close together in time, in the same bath, with the same agitation | The efficiency drifts with additive consumption and temperature; a calibration is a snapshot |
Measure the plated thickness, not the total thickness including the substrate or a seed layer. If a seed layer is there and cannot be subtracted, it shows up in the intercept, which is one reason the fit keeps one.
Worked example: twelve coupons at 2 A/dm²
Two coupons were plated at each of six times and measured at the same spot.
| Time (min) | Thickness, coupon 1 (µm) | Thickness, coupon 2 (µm) |
|---|---|---|
| 2 | 0.88 | 0.92 |
| 4 | 1.79 | 1.77 |
| 6 | 2.63 | 2.55 |
| 8 | 3.45 | 3.49 |
| 10 | 4.26 | 4.33 |
| 12 | 5.16 | 5.12 |
The fit
The least-squares line through the twelve points is
h = 0.07 + 0.423·t
with h in µm and t in minutes: the slope b = 0.423 µm/min is the deposition rate and the intercept a = 0.07 µm is where the line crosses zero time. The slope comes from the centred sums, b = Σ(t − t̄)(h − h̄) / Σ(t − t̄)², with t̄ = 7 min and Σ(t − t̄)² = 140 min²; the intercept is a = h̄ − b·t̄. R² = 0.9996 and the residual standard deviation, s = √(SS_res/(n − 2)) with n − 2 = 10, is 0.033 µm.
Reading the three numbers
Rate. 0.423 µm/min. This, not the Faraday rate, is the number for planning a run.
Efficiency. η = 0.423 / 0.441 = 96.0 %. The bath puts 96 % of its charge into copper at this current density. Entered into the Faraday calculation, this is the efficiency that turns the theoretical charge into the real one.
Time to target. A 10 µm deposit takes t = (10 − 0.07) / 0.423 = 23.5 min from the start of the run. The intercept is subtracted, not ignored: if the first 0.07 µm is a seed layer that is already there, the run needs 0.07 µm less; if it is an initiation delay, the intercept would be negative and the run would need more.
What the other two numbers say
Residual standard deviation. 0.033 µm is the scatter of the coupons around the line. Compare it with the repeatability of the thickness gauge: if a bias study on the gauge gives a repeatability of about 0.03 µm, the scatter here is of the same size as the gauge's own, so the coupons show no process variation that the gauge could resolve, though a variation smaller than the gauge scatter cannot be ruled out. If the residuals were three times the gauge repeatability, something besides measurement would be varying between coupons, and the next step is a look at the residuals against time and against coupon position.
R². 0.9996 says the twelve points lie on a line. It does not say the line is right: a gauge that reads 10 % high gives the same R² and an efficiency 10 % high. R² is a check on linearity, not on the calibration.
An uncertainty for the slope
The standard error of the slope is s / √Σ(t − t̄)² = 0.033 / √140 = 0.0028 µm/min. With n − 2 = 10 degrees of freedom, the two-sided 95 % critical value from the t table is 2.228, so the slope is 0.423 ± 2.228 × 0.0028, that is 0.417 to 0.429 µm/min, and the efficiency 94.6 % to 97.4 %. That interval is what the twelve coupons can say about the bath on that day; it is why a calibration quoted as "96.0 %" to one decimal is overstating what was measured, and why a difference of a percentage point between two calibrations is not evidence of a change.
Curvature, and when a straight line is the wrong model
The line assumes the rate is constant over the run. It is not always: an efficiency that falls as the deposit thickens, an additive that depletes, or a current that was not constant all produce curvature, and a straight line fitted through a curve averages over it. The signs are residuals that are positive at both ends and negative in the middle, or the reverse. When that happens, the slope is still the average rate over the times you plated, and a time-to-target estimate inside that range is only as good as the line's fit to the points nearest the target, so check it against the tolerance you need; the efficiency is an average, and extrapolating beyond the longest time is not justified. Plate longer coupons rather than extrapolate, or fit a model that follows the curvature and has been checked on data of its own.
Common mistakes
- Reading the efficiency from one coupon. One thickness divided by one time includes the intercept and one coupon's measurement error. The slope over several times does not.
- Forcing the line through the origin. It looks like physics, but a seed layer or an initiation delay then biases the slope. Let the intercept absorb it and read the slope.
- Mixing current densities, or baths, in one fit. Each is its own calibration.
- Calibrating with an uncalibrated gauge. The fit inherits the gauge's bias. A bias study on the thickness gauge comes first.
- Quoting the efficiency without its interval. 96.0 % from twelve coupons is 94.6–97.4 %. Decide what precision the application needs, and plate enough coupons to get it.
- Treating the calibration as permanent. It is a snapshot of the bath. Repeat it when the additives are replenished, the temperature set point changes, or the plated thickness starts to disagree with the plan.
Using the tool and the guides
Paste the time and thickness columns into the Plating Rate and Efficiency Calculator with the header min,um, enter the current density and, if you want the plating time, the target thickness; it returns the slope, intercept, R², residual standard deviation, theoretical rate, efficiency and time to target computed as above. The Copper electroplating and Faraday's law guide derives the theoretical rate and takes the efficiency as an input; this guide is where that input comes from. The Measurement system analysis guide covers the bias and repeatability of the gauge the coupons are measured with, and the Z, t and chi-square tables guide supplies the critical value in the slope interval.
Sources and further reading
- OpenStax, Chemistry 2e, Section 17.7 Electrolysis: the Faraday relation between charge and deposited mass (openstax.org).
- NIST/SEMATECH e-Handbook of Statistical Methods, Section 4.4, Process Modeling: least squares, residual analysis and the standard error of a fitted slope.
- Montgomery, D. C., Peck, E. A. and Vining, G. G., Introduction to Linear Regression Analysis, Wiley: simple linear regression, residuals and confidence intervals on the slope.
- Kitstead Labs: Plating Rate and Efficiency Calculator, Copper electroplating and Faraday's law, Measurement system analysis, Z, t and chi-square tables.