Process
Plating Rate and Efficiency Calculator (Thickness vs Time)
Fit measured thickness against plating time to get the deposition rate, the current efficiency the bath actually delivers, and the time a target thickness will take. Every value is entered by you; the tool adds no data of its own.
01Inputs
02Result
Fit details
03Method
Use this tool after plating a few coupons for different times at one current density and measuring their thickness. It turns those readings into the rate the bath actually plates at and the current efficiency behind it, which is the number the Faraday calculation needs and cannot supply. It assumes one bath, one current density and one measurement method for all coupons.
AHow it is calculated
The tool fits a straight line to the readings and compares its slope with the rate Faraday's law gives at 100 % current efficiency. With n readings of plating time t in minutes and thickness h in µm:
- Least squares with intercept gives the slope b, the deposition rate, and the intercept a.
- R² compares the residual sum of squares with the total; the residual standard deviation uses n − 2 degrees of freedom.
- The theoretical rate at 100 % efficiency follows from Faraday's law, with J in A/m² (A/dm² × 100), M = 0.063546 kg/mol, z = 2, F = 96485.33212 C/mol and ρ = 8960 kg/m³, converted to µm/min.
- The current efficiency is the measured slope divided by the theoretical rate, and the time to a target thickness follows from the fitted line.
The default readings are twelve coupons plated for 2 to 12 minutes at 2 A/dm², two per time. They fit h = 0.07 + 0.423·t µm; the theoretical rate for copper at 2 A/dm² is 0.441 µm/min, so the current efficiency is 96.0 %, R² = 0.9996 and the residual standard deviation 0.033 µm; a 10 µm deposit takes 23.5 min.
BScope and limitations
- Copper only: M, z and ρ are the copper values used in the Faraday guide. For another metal the theoretical rate, and so the efficiency, would be wrong.
- The efficiency is the slope ratio, so it is an average over the run; a bath whose efficiency falls as the deposit thickens shows up as curvature the straight line averages over. Look at the residual standard deviation against your measurement repeatability.
- The intercept is reported, not explained: a positive intercept can be a seed layer or copper that was there before the timer started; a negative one can be an initiation delay, since h = b·(t − τ) has intercept −b·τ, or first readings that are low. Neither is a defect of the fit.
- Thickness must be the plated thickness at the measured spot. If the coupons are not uniform, the rate and efficiency are for that spot, not for the bath.
- With three points the fit has one degree of freedom for the residual; treat R² and the residual standard deviation from such a run as indicative only.
- The calculator does not give a confidence interval for the slope; one can be computed by hand as b ± t·s/√Σ(t − t̄)², with t the two-sided critical value for n − 2 degrees of freedom from the Z, t and chi-square tables guide. For the derivation of the theoretical rate read the Copper electroplating and Faraday's law guide; for what the calibration means in practice read the Plating rate calibration guide.
CCommon mistakes
- Fitting through the origin because "zero time means zero thickness". If the first readings include a seed layer or an initiation delay, forcing the line through the origin biases the slope; let the intercept absorb it and read the slope.
- Mixing current densities in one data set. The theoretical rate is proportional to current density; coupons plated at different densities belong to different fits.
- Reading the efficiency from a single coupon. One thickness divided by one time includes the intercept and the measurement error; the slope over several times does not.
- Taking R² as proof of a good calibration. Twelve points along a straight line give R² close to 1 even when every reading is 10 % high from a miscalibrated gauge; R² says the points are collinear, not that the thickness or the efficiency read from them is right. Trust the measurement system first (see the Measurement system analysis guide).
- Using the fit outside its time range. A line fitted on 2–12 minutes says nothing about what happens at 60; extrapolated time-to-target is an estimate, not a recipe.
- Entering time in seconds or hours. The header is min,um; a time column in the wrong unit changes the slope by a factor of 60 and the efficiency with it.
Related tools
- Loading…
Further reading
- OpenStax, Chemistry 2e, Section 17.7 Electrolysis (the Faraday relation between charge and deposited mass).
- Montgomery, D. C., Peck, E. A. and Vining, G. G., Introduction to Linear Regression Analysis, Wiley: simple linear regression, residuals and R².
- NIST/SEMATECH e-Handbook of Statistical Methods, Section 4.4, Process Modeling: least squares and its assumptions.