Process statistics

Sigma Level and the 1.5σ Shift: What 3.4 DPMO Assumes

Kitstead Labs · Engineering reference · Synthetic worked example

A "six sigma" process is quoted at 3.4 defects per million opportunities, but a normal distribution puts far less than that beyond six standard deviations. The difference is a 1.5σ shift that the sigma-level convention adds to every conversion. This guide shows where the 1.5 comes from and how little of it can be traced to published data, how quickly a control chart detects a shift of that size, and how to measure the shift in your own process instead of assuming it, with a worked example in the site's I-MR, capability and DPMO calculators.

Quick answer

Under the shifted convention used by the DPMO calculator, a sigma level is a Z value, the distance from the process mean to a specification limit in standard deviations, plus a 1.5σ allowance for drift of the mean; some reports quote the short-term Z without it. The shifted convention reads a sigma level of 6 as a long-term Z of 4.5, which leaves 3.4 defects per million beyond the limit; without the shift, 6σ on both sides of a centered process leaves about 0.002 per million. The 1.5 is an assumption, not a measured constant: the public pages reviewed for this guide give no underlying data for it, one critic calls it a best case for a process that is actually monitored, and an X̄ chart with subgroups of four signals a sustained shift of that size after two subgroups on average. If you have stable data, compute the short-term and long-term Z from Cpk and Ppk, report the difference you actually measured, and say which one any sigma level you quote is based on.

DPMO, Z and sigma level

Three numbers describe the same tail of the normal distribution:

The DPMO and Sigma Level Calculator converts among the three and shows Z without the shift beside the sigma level. The table below gives the conversion at whole sigma levels, with the shift, and the tail areas the same numbers would give without it.

Sigma level and DPMO with the 1.5σ shift, and the normal tail areas without it
Sigma levelDPMO with the 1.5σ shift (one tail at sigma level − 1.5)Tail beyond Z, one side, no shift (ppm)Both tails of a centered process, no shift (ppm)
366,8071,3502,700
46,21031.763.3
52330.2870.573
63.40.000990.00197

Each entry is computed from the standard normal distribution. The last column is what a Cp of exactly 1, 4/3, 5/3 and 2 would give for a process centered between its limits; the NIST/SEMATECH e-Handbook gives the same figure, 2 parts per billion, for Cp = 2.00 and notes that its figures assume the process is centered. Minitab's documentation tabulates the convention the other way round: a benchmark Z of 4.5 is a sigma capability of 6.0σ and 3.4 PPM defective, with the note that the sigma capability assumes a 1.5σ shift.

The shift changes the result by orders of magnitude at high sigma levels. At a sigma level of 4, the convention gives 6,210 DPMO; the unshifted one-sided tail at Z = 4 is 31.7 ppm, about 200 times smaller.

0.0001 0.001 0.01 0.1 1 10 100 1,000 10,000 100,000 1,000,000 2 3 4 5 6 Sigma level Defects per million opportunities (log scale) 66,807 6,210 233 3.4 1,350 31.7 0.287 0.00099 With 1.5σ shift No shift
Defects per million opportunities against sigma level, on a logarithmic scale, with the conventional 1.5σ shift (upper curve) and without it (lower curve, one tail beyond Z). At a sigma level of 6 the two differ by a factor of about 3,400.

Where the 1.5 comes from

The freely available sources reviewed for this guide explain the 1.5 in different ways.

This guide reads them as describing the 1.5 as an allowance for drift of the mean that goes undetected, not as a measured property of every process. It does not cite the shift as an empirical result, because the public pages reviewed here give no underlying data and the full text of the 1992 book was not available.

How fast a chart catches a 1.5σ shift

If the 1.5 stands for drift that a control chart does not catch, the obvious question is how long a chart takes to catch a shift that size. The average run length (ARL) answers it: the expected number of points plotted before the chart signals. With a sustained shift of 1.5 process standard deviations, normal data and 3σ limits with the mean and sigma known, the chance that one point falls beyond a limit is Φ(−3 + 1.5√n) + Φ(−3 − 1.5√n), where n is the subgroup size and Φ is the standard normal distribution function, and the ARL is one over that chance.

Average run length after a sustained 1.5σ shift, by subgroup size
Subgroup size nChartARL after a 1.5σ shift (points)
1Individuals (I)14.97
2X̄5.27
3X̄2.91
4X̄2.00
5X̄1.57
10X̄1.04

With no shift the ARL is 370.40 points for every n. The table uses the single-point test only; adding run rules shortens the delay further, as the control chart run rules guide shows for shifts of 0.4σ to 2σ on an individuals chart.

An X̄ chart with subgroups of four signals a sustained 1.5σ shift after two subgroups on average; an individuals chart takes about fifteen readings. Speed in points is not speed in time: at one reading per hour, about fifteen readings means about fifteen hours on average, and Wheeler notes that shifts of up to 1.5σ are not detected quickly. He also calls the 1.5σ figure a best-case number, not a worst case, for a process whose location is monitored efficiently, and writes that without such monitoring there is no limit on the size of the shifts that can occur. Coskun and Ialongo note that the actual shift may be smaller than 1.5σ. These readings point the same way: whether a 1.5σ allowance is too large, about right or too small depends on how the process is monitored, which a fixed constant cannot know.

Measuring your own shift: short-term and long-term Z

Minitab's documentation computes the short-term Z from the within standard deviation and the long-term Z from the overall standard deviation, and calls their difference the Z shift. The same two standard deviations give Cpk and Ppk, which the Cpk vs Ppk guide explains. Measured to the nearer specification limit:

A process whose mean wanders between days, shifts or lots has an overall standard deviation larger than its within standard deviation, a Ppk below its Cpk, and a positive Z shift. A process that is stable over the period of the data has the two standard deviations close together and a measured shift near zero, which can come out slightly negative from sampling error alone. Minitab's benchmark Z (Z.bench) places the defects from both tails in one tail before converting; for a process close to one limit and far from the other, as in the example below, the nearer-limit Z and the benchmark Z are almost the same.

The measured shift covers only the period the data span. Data from one week describe one week; drift that happens over months appears only in data collected over months.

Worked example: a stable process measured against the convention

The readings below are synthetic. They represent the diameter in millimeters of one shaft measured at each sampling interval on a turning operation, with a specification of 12.000 ± 0.025 mm (LSL 11.975, USL 12.025). They were generated from a normal distribution with mean 12.004 mm and standard deviation 0.005 mm and rounded to 0.001 mm. The random seed was the first, counting up from 1, for which no reading or moving range signals on the I-MR chart under the single-point test or the four Western Electric rules; that was seed 1.

Readings 1 to 100, in order: 12.006, 12.004, 11.998, 12.006, 12.006, 11.995, 12.012, 12.003, 12.007, 12.015, 12.003, 11.995, 12.001, 12.004, 11.999, 12.004, 12.001, 12.008, 11.995, 12.007, 12.014, 12.003, 12.002, 11.994, 11.999, 12.000, 12.010, 11.999, 12.004, 11.996, 12.001, 12.000, 12.000, 12.005, 11.999, 12.010, 12.004, 11.992, 12.006, 12.010, 11.996, 12.005, 12.010, 11.998, 12.000, 12.017, 12.008, 12.003, 11.995, 11.998, 12.005, 12.006, 11.998, 12.001, 12.000, 11.997, 12.004, 12.001, 12.007, 12.008, 12.006, 12.010, 12.005, 12.004, 12.002, 12.008, 12.001, 12.004, 11.996, 12.000, 12.003, 12.006, 12.006, 12.006, 12.007, 12.005, 12.003, 12.003, 11.997, 12.007, 11.995, 12.002, 12.000, 12.001, 12.003, 12.013, 12.007, 12.008, 11.997, 12.008, 12.014, 12.013, 12.007, 12.014, 11.996, 12.001, 12.002, 12.006, 12.003, 12.000.

Step 1: check stability. Pasted into the I-MR Control Chart Calculator, the 100 readings give a center line of 12.0034 mm, Individuals limits of 11.9878 to 12.0190 mm and a moving range UCL of 0.0191 mm, with no reading and no moving range outside its limits. Every reading lies between −2.20σ and +2.61σ of the center line, and none of the four Western Electric rules fires. These tests find no evidence of instability in the 100 readings, and capability is read from them on that basis.

1 10 20 30 40 50 60 70 80 90 100 11.970 11.980 11.990 12.000 12.010 12.020 12.030 Reading Shaft diameter (mm) USL 12.025 UCL 12.0190 CL 12.0034 LCL 11.9878 LSL 11.975
The 100 synthetic shaft diameters in sampling order, with the center line and 3σ control limits from all 100 readings and the specification limits. No reading crosses a control limit, and the upper specification limit lies 4.15 within-process standard deviations above the mean.

Step 2: Cpk and Ppk. With the same readings and the limits 11.975 and 12.025, the Process Capability Calculator reports:

Process Capability Calculator results for the 100 shaft diameters
QuantityValue
Mean12.0034 mm
MR̄0.0059 mm
σ within (MR̄/1.128)0.0052 mm
s (overall)0.0052 mm
Cp / Pp1.604 / 1.599
Cpk / Ppk1.384 / 1.380
Nearest limit distance (to the USL)0.0216 mm

Step 3: the measured shift. Short-term Z = 3 × 1.384 = 4.15; long-term Z = 3 × 1.380 = 4.14. The measured Z shift is 0.01 at the calculator's rounding (0.014 from the unrounded values), not 1.5.

Step 4: the defect rate, two ways. In sigma-level mode the DPMO calculator treats its input as a sigma level that already includes the 1.5σ shift and subtracts it before reading the tail.

The same process converted to DPMO two ways in the DPMO calculator
RouteInput to the DPMO calculatorDPMO shown
Convention: quote the short-term Z as the sigma levelSigma level 4.154,025
Data: use the long-term Z, adding back the 1.5 the calculator removesSigma level 5.64 (= 4.14 + 1.5)17.37

From the unrounded Z values the two routes give 3,988 and 17.43 DPMO. Either way the convention reports about 230 times as many defects as this process's own long-term spread supports. Both numbers rest on the normal model in the tail, far beyond any of the 100 readings; neither has been observed.

The same process also has two sigma levels, depending on which of Minitab's reporting conventions is used: 4.15 as the short-term Z, or 5.64 as the long-term Z plus 1.5. A report that gives "the sigma level" without saying which can be off by more than a full sigma.

Which number to report

What the numbers assume

Common mistakes

Using the calculators with this guide

The I-MR Control Chart Calculator checks stability for individual readings; the Subgroup Control Chart Calculator does the same for subgrouped data. The Process Capability Calculator gives Cpk and Ppk for individual readings in collection order; it does not accept subgrouped data. The DPMO and Sigma Level Calculator converts between DPMO, Z and the conventional sigma level, with Z shown unshifted beside it. The statistical tables guide lists the standard normal tail areas used throughout.

Sources and further reading