Process statistics
Sigma Level and the 1.5σ Shift: What 3.4 DPMO Assumes
A "six sigma" process is quoted at 3.4 defects per million opportunities, but a normal distribution puts far less than that beyond six standard deviations. The difference is a 1.5σ shift that the sigma-level convention adds to every conversion. This guide shows where the 1.5 comes from and how little of it can be traced to published data, how quickly a control chart detects a shift of that size, and how to measure the shift in your own process instead of assuming it, with a worked example in the site's I-MR, capability and DPMO calculators.
Quick answer
Under the shifted convention used by the DPMO calculator, a sigma level is a Z value, the distance from the process mean to a specification limit in standard deviations, plus a 1.5σ allowance for drift of the mean; some reports quote the short-term Z without it. The shifted convention reads a sigma level of 6 as a long-term Z of 4.5, which leaves 3.4 defects per million beyond the limit; without the shift, 6σ on both sides of a centered process leaves about 0.002 per million. The 1.5 is an assumption, not a measured constant: the public pages reviewed for this guide give no underlying data for it, one critic calls it a best case for a process that is actually monitored, and an X̄ chart with subgroups of four signals a sustained shift of that size after two subgroups on average. If you have stable data, compute the short-term and long-term Z from Cpk and Ppk, report the difference you actually measured, and say which one any sigma level you quote is based on.
DPMO, Z and sigma level
Three numbers describe the same tail of the normal distribution:
- DPMO, defects per million opportunities, is the defect rate scaled to one million.
- Z is the standard normal quantile with that upper-tail probability: 3.4 DPMO is Z = 4.50.
- Sigma level is Z plus 1.5 under the usual convention: 3.4 DPMO is a sigma level of 6.00.
The DPMO and Sigma Level Calculator converts among the three and shows Z without the shift beside the sigma level. The table below gives the conversion at whole sigma levels, with the shift, and the tail areas the same numbers would give without it.
| Sigma level | DPMO with the 1.5σ shift (one tail at sigma level − 1.5) | Tail beyond Z, one side, no shift (ppm) | Both tails of a centered process, no shift (ppm) |
|---|---|---|---|
| 3 | 66,807 | 1,350 | 2,700 |
| 4 | 6,210 | 31.7 | 63.3 |
| 5 | 233 | 0.287 | 0.573 |
| 6 | 3.4 | 0.00099 | 0.00197 |
Each entry is computed from the standard normal distribution. The last column is what a Cp of exactly 1, 4/3, 5/3 and 2 would give for a process centered between its limits; the NIST/SEMATECH e-Handbook gives the same figure, 2 parts per billion, for Cp = 2.00 and notes that its figures assume the process is centered. Minitab's documentation tabulates the convention the other way round: a benchmark Z of 4.5 is a sigma capability of 6.0σ and 3.4 PPM defective, with the note that the sigma capability assumes a 1.5σ shift.
The shift changes the result by orders of magnitude at high sigma levels. At a sigma level of 4, the convention gives 6,210 DPMO; the unshifted one-sided tail at Z = 4 is 31.7 ppm, about 200 times smaller.
Where the 1.5 comes from
The freely available sources reviewed for this guide explain the 1.5 in different ways.
- The convention. Minitab's documentation states that practitioners usually assume a 1.5σ shift between short-term and long-term Z, ZST = ZLT + 1.5. It describes two ways of reporting sigma capability, the short-term Z.bench or 1.5 plus the long-term Z.bench, and advises confirming which one your company or industry uses.
- The attribution. An iSixSigma article (2024) attributes the figure to long-term variation of the process mean observed at Motorola, which it puts between 1.4 and 1.6 sigma, and cites Harry and Lawson's 1992 book Six Sigma Producibility Analysis and Process Characterization. The article does not give the underlying data, and the full text of the book was not available for this guide.
- The missing study. Donald Wheeler (2003) writes that six-sigma documents from the early 1990s alluded to a research study for the shift without citing one, and that the shift came to be taken as an axiom.
- The statistical argument. Coskun and Ialongo (2020), citing earlier work by Ialongo and Bernardini, trace the statistical basis of the shift to Shewhart control charts: the chart's power to detect a shift is acceptable for every subgroup size from 1 to 10 only when the shift is at least 1.5σ, so the 1.5 works as a correction for a blind spot in monitoring. They conclude that the 1.5 should not be treated as a universal constant and should be used only where evidence supports it.
This guide reads them as describing the 1.5 as an allowance for drift of the mean that goes undetected, not as a measured property of every process. It does not cite the shift as an empirical result, because the public pages reviewed here give no underlying data and the full text of the 1992 book was not available.
How fast a chart catches a 1.5σ shift
If the 1.5 stands for drift that a control chart does not catch, the obvious question is how long a chart takes to catch a shift that size. The average run length (ARL) answers it: the expected number of points plotted before the chart signals. With a sustained shift of 1.5 process standard deviations, normal data and 3σ limits with the mean and sigma known, the chance that one point falls beyond a limit is Φ(−3 + 1.5√n) + Φ(−3 − 1.5√n), where n is the subgroup size and Φ is the standard normal distribution function, and the ARL is one over that chance.
| Subgroup size n | Chart | ARL after a 1.5σ shift (points) |
|---|---|---|
| 1 | Individuals (I) | 14.97 |
| 2 | X̄ | 5.27 |
| 3 | X̄ | 2.91 |
| 4 | X̄ | 2.00 |
| 5 | X̄ | 1.57 |
| 10 | X̄ | 1.04 |
With no shift the ARL is 370.40 points for every n. The table uses the single-point test only; adding run rules shortens the delay further, as the control chart run rules guide shows for shifts of 0.4σ to 2σ on an individuals chart.
An X̄ chart with subgroups of four signals a sustained 1.5σ shift after two subgroups on average; an individuals chart takes about fifteen readings. Speed in points is not speed in time: at one reading per hour, about fifteen readings means about fifteen hours on average, and Wheeler notes that shifts of up to 1.5σ are not detected quickly. He also calls the 1.5σ figure a best-case number, not a worst case, for a process whose location is monitored efficiently, and writes that without such monitoring there is no limit on the size of the shifts that can occur. Coskun and Ialongo note that the actual shift may be smaller than 1.5σ. These readings point the same way: whether a 1.5σ allowance is too large, about right or too small depends on how the process is monitored, which a fixed constant cannot know.
Measuring your own shift: short-term and long-term Z
Minitab's documentation computes the short-term Z from the within standard deviation and the long-term Z from the overall standard deviation, and calls their difference the Z shift. The same two standard deviations give Cpk and Ppk, which the Cpk vs Ppk guide explains. Measured to the nearer specification limit:
- Short-term Z = (distance from the mean to the nearer limit) / σ within = 3 × Cpk.
- Long-term Z = (distance from the mean to the nearer limit) / σ overall = 3 × Ppk.
- Measured Z shift = short-term Z − long-term Z = 3 × (Cpk − Ppk).
A process whose mean wanders between days, shifts or lots has an overall standard deviation larger than its within standard deviation, a Ppk below its Cpk, and a positive Z shift. A process that is stable over the period of the data has the two standard deviations close together and a measured shift near zero, which can come out slightly negative from sampling error alone. Minitab's benchmark Z (Z.bench) places the defects from both tails in one tail before converting; for a process close to one limit and far from the other, as in the example below, the nearer-limit Z and the benchmark Z are almost the same.
The measured shift covers only the period the data span. Data from one week describe one week; drift that happens over months appears only in data collected over months.
Worked example: a stable process measured against the convention
The readings below are synthetic. They represent the diameter in millimeters of one shaft measured at each sampling interval on a turning operation, with a specification of 12.000 ± 0.025 mm (LSL 11.975, USL 12.025). They were generated from a normal distribution with mean 12.004 mm and standard deviation 0.005 mm and rounded to 0.001 mm. The random seed was the first, counting up from 1, for which no reading or moving range signals on the I-MR chart under the single-point test or the four Western Electric rules; that was seed 1.
Readings 1 to 100, in order: 12.006, 12.004, 11.998, 12.006, 12.006, 11.995, 12.012, 12.003, 12.007, 12.015, 12.003, 11.995, 12.001, 12.004, 11.999, 12.004, 12.001, 12.008, 11.995, 12.007, 12.014, 12.003, 12.002, 11.994, 11.999, 12.000, 12.010, 11.999, 12.004, 11.996, 12.001, 12.000, 12.000, 12.005, 11.999, 12.010, 12.004, 11.992, 12.006, 12.010, 11.996, 12.005, 12.010, 11.998, 12.000, 12.017, 12.008, 12.003, 11.995, 11.998, 12.005, 12.006, 11.998, 12.001, 12.000, 11.997, 12.004, 12.001, 12.007, 12.008, 12.006, 12.010, 12.005, 12.004, 12.002, 12.008, 12.001, 12.004, 11.996, 12.000, 12.003, 12.006, 12.006, 12.006, 12.007, 12.005, 12.003, 12.003, 11.997, 12.007, 11.995, 12.002, 12.000, 12.001, 12.003, 12.013, 12.007, 12.008, 11.997, 12.008, 12.014, 12.013, 12.007, 12.014, 11.996, 12.001, 12.002, 12.006, 12.003, 12.000.
Step 1: check stability. Pasted into the I-MR Control Chart Calculator, the 100 readings give a center line of 12.0034 mm, Individuals limits of 11.9878 to 12.0190 mm and a moving range UCL of 0.0191 mm, with no reading and no moving range outside its limits. Every reading lies between −2.20σ and +2.61σ of the center line, and none of the four Western Electric rules fires. These tests find no evidence of instability in the 100 readings, and capability is read from them on that basis.
Step 2: Cpk and Ppk. With the same readings and the limits 11.975 and 12.025, the Process Capability Calculator reports:
| Quantity | Value |
|---|---|
| Mean | 12.0034 mm |
| MR̄ | 0.0059 mm |
| σ within (MR̄/1.128) | 0.0052 mm |
| s (overall) | 0.0052 mm |
| Cp / Pp | 1.604 / 1.599 |
| Cpk / Ppk | 1.384 / 1.380 |
| Nearest limit distance (to the USL) | 0.0216 mm |
Step 3: the measured shift. Short-term Z = 3 × 1.384 = 4.15; long-term Z = 3 × 1.380 = 4.14. The measured Z shift is 0.01 at the calculator's rounding (0.014 from the unrounded values), not 1.5.
Step 4: the defect rate, two ways. In sigma-level mode the DPMO calculator treats its input as a sigma level that already includes the 1.5σ shift and subtracts it before reading the tail.
| Route | Input to the DPMO calculator | DPMO shown |
|---|---|---|
| Convention: quote the short-term Z as the sigma level | Sigma level 4.15 | 4,025 |
| Data: use the long-term Z, adding back the 1.5 the calculator removes | Sigma level 5.64 (= 4.14 + 1.5) | 17.37 |
From the unrounded Z values the two routes give 3,988 and 17.43 DPMO. Either way the convention reports about 230 times as many defects as this process's own long-term spread supports. Both numbers rest on the normal model in the tail, far beyond any of the 100 readings; neither has been observed.
The same process also has two sigma levels, depending on which of Minitab's reporting conventions is used: 4.15 as the short-term Z, or 5.64 as the long-term Z plus 1.5. A report that gives "the sigma level" without saying which can be off by more than a full sigma.
Which number to report
- For a defect rate, report the long-term estimate, from the overall standard deviation of stable data, together with the period the data cover. Where defects can be counted, the observed DPMO is better than either Z conversion.
- For a sigma level, say which convention it follows: short-term Z, or long-term Z plus 1.5. Minitab's documentation advises checking the convention used in your company or industry; this guide adds that the convention should be written next to the number.
- When you apply the 1.5, say so and say why. If you have a reason to allow for future drift, state the allowance as an assumption, separately from what the data show.
- Keep Cpk and Ppk beside any Z. Short-term and long-term Z are three times Cpk and Ppk to the nearer limit, and the indices carry the same information in a form most readers already know.
What the numbers assume
- Normal data in the tail. Every conversion here reads a normal tail far beyond the data, so it needs the normal model and does not carry over directly to output that is not normal. Coskun and Ialongo write that the 1.5σ shift should be applied to normally distributed data, and that including it for processes whose output is not normal, such as error rates in laboratory steps outside the analysis itself, makes the sigma metric deviate greatly from actual performance. A skewed process can have a tail much heavier or lighter than the normal one at Z = 4. Process capability for non-normal data shows how far apart three fitted shapes put the tail for one set of skewed readings.
- A stable process. Capability, and therefore Z, means something only for a process in statistical control over the period of the data. The worked example checks this first.
- Monitoring. The ARL table assumes the chart is in use and its signals are acted on. A process that is not monitored can drift by more than 1.5σ, as Wheeler's examples of shifts several times larger show.
- Known mean and sigma. The ARL values treat the center line and sigma as exact. Limits estimated from a limited baseline give somewhat different run lengths; this guide does not compute that effect.
Common mistakes
- Quoting a sigma level without its convention. The same process is a 4.15 or a 5.64 in the worked example.
- Treating 3.4 DPMO as a measured rate. It is the tail of a normal model at Z = 4.5, a convention-based figure, not a count of defects.
- Applying the 1.5 twice. Entering a long-term Z that already reflects drift into a conversion that subtracts 1.5 again double-counts the drift. The DPMO calculator's sigma-level mode subtracts the shift once, from whatever is entered.
- Reading the shift from too short a period. A week of stable data measures a shift near zero for that week, not for the year.
- Using the shift on data that are not normal. Proportions of late deliveries or error counts are not normally distributed, and the normal-tail conversion behind the 1.5σ allowance does not describe them.
Using the calculators with this guide
The I-MR Control Chart Calculator checks stability for individual readings; the Subgroup Control Chart Calculator does the same for subgrouped data. The Process Capability Calculator gives Cpk and Ppk for individual readings in collection order; it does not accept subgrouped data. The DPMO and Sigma Level Calculator converts between DPMO, Z and the conventional sigma level, with Z shown unshifted beside it. The statistical tables guide lists the standard normal tail areas used throughout.
Sources and further reading
- Minitab Support: Z.bench as an estimate of sigma capability — short-term and long-term Z.bench, the Z shift, the usual 1.5σ assumption, the two reporting conventions and the Z.bench table.
- NIST/SEMATECH e-Handbook of Statistical Methods, Section 6.1.6, What is Process Capability? — Cp, Cpk and the reject rates for a centered process.
- Wheeler, D. J., The Six-Sigma Zone, SPC Press, Manuscript No. 177, 2003 — the uncited origin of the shift, the shift as a best case, and examples of larger shifts.
- Coskun, A. and Ialongo, C., Six Sigma revisited: We need evidence to include a 1.5 SD shift in the extraanalytical phase of the total testing process, Biochemia Medica, 30(1), 010901, 2020 — the control-chart basis of the shift and the case against a universal constant.
- Swinney, Z., 1.5 Sigma Process Shift: What It Means For Your Business, iSixSigma, 2024 — the attribution to Motorola and to Harry and Lawson.
- Harry, M. J. and Lawson, J. R., Six Sigma Producibility Analysis and Process Characterization, Addison-Wesley, 1992.
- Kitstead Labs guides: Cpk vs Ppk, Control chart run rules, Statistical tables.