Process monitoring
OEE Explained with Six Equipment States: Calculation, Four Factors and a Worked Week
A one-tool, one-week example for engineers who have to say where the hours went.
Quick answer
Overall equipment effectiveness (OEE) is the share of total time in which a tool was making good units at its ideal rate. Everything else is a loss, and the point of the calculation is to put the losses in order, not to produce one number. This guide splits time into six equipment states, derives four factors from them (availability efficiency, operational efficiency, rate efficiency and quality efficiency), shows how they collapse into the familiar availability, performance and quality, and works one fictional week on one tool from the state log to the losses in minutes. The OEE Calculator takes the same six states, unit counts and ideal rate and returns every number in this guide.
About the example. All times, unit counts and rates in this article are fictional and chosen to make the arithmetic easy to follow. One week, one tool, minutes as the unit. Real tools report time in finer categories and over many weeks; the method does not change.
Six equipment states
A tool is always in exactly one state. Logging time by state is what makes OEE reproducible, because every loss has a place to go and nothing is counted twice.
| State | What is happening | Counted as |
|---|---|---|
| Non-scheduled | The tool is not planned to run: no shift, plant shutdown, holiday. | Total time, outside operations time |
| Unscheduled downtime | The tool cannot run because of a failure or an unplanned stop. | Downtime |
| Scheduled downtime | The tool cannot run because of planned work: preventive maintenance, planned facility work. | Downtime |
| Engineering | The tool is running but for evaluation, qualification or process development, not production. | Uptime, not productive |
| Standby | The tool could run but has nothing to run: no lots, no operator, waiting for a downstream tool. | Uptime, not productive |
| Productive | The tool is processing production units. | Uptime, productive |
Three sums come straight from the log. Total time is all six states. Uptime is engineering, standby and productive together: the tool was capable of running. Downtime is the two downtime states. Operations time, total time minus non-scheduled time, is useful for reporting but is not the denominator of OEE in this guide; the section on the denominator explains why that choice matters.
Four factors, and how they become three
The four-factor form keeps the equipment states visible. Each factor is a ratio of two quantities you can point to in the log.
| Factor | Formula | Question it answers |
|---|---|---|
| Availability efficiency, AE | Uptime ÷ total time | How much of the time was the tool capable of running? |
| Operational efficiency, OE | Productive time ÷ uptime | When it could run, how much of the time did it actually process production? |
| Rate efficiency, RE | (Total units × ideal cycle time) ÷ productive time | When it processed production, how close was it to the ideal rate? |
| Quality efficiency, QE | Good units ÷ total units | Of what it made, how much was good? |
OEE = AE × OE × RE × QE.
The three-factor form most people know is the same calculation with the first two factors multiplied together:
| Three-factor name | Equals | In words |
|---|---|---|
| Availability | AE × OE = productive time ÷ total time | Share of total time spent producing |
| Performance | RE | Speed against the ideal rate |
| Quality | QE | Yield of the units produced |
Collapsing AE and OE into one availability number hides the most useful distinction in the log: a tool that is down (low AE) and a tool that is up but idle (low OE) need different people and different actions. Keep the four-factor view for diagnosis and report the three-factor view if that is what the site is used to.
The ideal cycle time is the design or demonstrated best rate for the product, written as minutes per unit. If the rate is given as units per hour (UPH), the ideal cycle time is 60 divided by UPH. A rate efficiency above 100 % means the tool ran faster than the ideal you entered, which is a sign that the ideal rate is wrong, not that the tool beat physics.
Worked example: one tool, one week
The fictional tool runs a single product. The week has 7 × 24 × 60 = 10,080 minutes. The state log, summed for the week:
| State | Minutes | Notes |
|---|---|---|
| Non-scheduled | 1,440 | One day with no shift planned |
| Unscheduled downtime | 480 | Two failures, 4 h each |
| Scheduled downtime | 600 | Weekly preventive maintenance |
| Engineering | 360 | A qualification run |
| Standby | 1,200 | Waiting for lots and operators |
| Productive | 6,000 | Production processing |
| Total | 10,080 |
Output for the week: 2,700 units processed, 2,646 good. Ideal rate 30 units per hour, so the ideal cycle time is 2 minutes per unit.
The factors
| Factor | Calculation | Value |
|---|---|---|
| Uptime | 360 + 1,200 + 6,000 | 7,560 min |
| AE | 7,560 ÷ 10,080 | 75.0 % |
| OE | 6,000 ÷ 7,560 | 79.4 % |
| Theoretical production time | 2,700 × 2 | 5,400 min |
| RE | 5,400 ÷ 6,000 | 90.0 % |
| QE | 2,646 ÷ 2,700 | 98.0 % |
| OEE | 0.75 × 0.7937 × 0.90 × 0.98 | 52.5 % |
In the three-factor view: availability 59.5 %, performance 90.0 %, quality 98.0 %, OEE 52.5 %. Actual throughput during productive time was 2,700 units in 100 hours, 27.0 UPH against the ideal 30.0.
The calculator reports the factors to one decimal place; the OEE above is computed from the unrounded factors, which is why 75.0 × 79.4 × 90.0 × 98.0 does not reproduce it exactly.
The losses in minutes
Converting the factors back into minutes is what makes the number actionable. Each row is one step of the waterfall in Figure 2: the minutes removed at that stage, taken in order, so the rows add up to the whole week.
| Loss | Minutes | Share of the week | Owner, typically |
|---|---|---|---|
| Non-scheduled | 1,440 | 14.3 % | Planning |
| Downtime (unscheduled 480, scheduled 600) | 1,080 | 10.7 % | Maintenance |
| Standby and engineering | 1,560 | 15.5 % | Production control, process engineering |
| Rate loss (ran at 27 UPH instead of 30) | 600 | 6.0 % | Process and equipment engineering |
| Quality loss (54 units at 2 min each) | 108 | 1.1 % | Process engineering |
| Good units at ideal rate | 5,292 | 52.5 % |
The biggest loss in this week is not downtime. It is the 1,560 minutes in which the tool was up and did nothing useful, most of it standby. A maintenance programme would not touch it. That is the argument for the four-factor view: the three-factor availability of 59.5 % blends a 10.7 % maintenance problem with a 15.5 % scheduling problem.
What the denominator does to the number
Sites disagree about whether non-scheduled time belongs in the denominator, and the disagreement moves the number more than most process improvements do. Recompute the same week on operations time (10,080 − 1,440 = 8,640 minutes):
| Basis | AE | OEE |
|---|---|---|
| Total time (this guide and the calculator) | 75.0 % | 52.5 % |
| Operations time (non-scheduled excluded) | 87.5 % | 61.3 % |
Nothing about the tool changed. If OEE figures are compared between tools, sites or weeks, the basis must be the same, and it must be written in the definition. Using total time is the stricter choice: it keeps the question "why was this tool not scheduled?" on the table, which matters for expensive equipment.
Reading the result and choosing what to attack
Order the losses by minutes, not by factor percentage. A factor at 90 % that applies to 6,000 minutes costs more than a factor at 80 % that applies to 1,000 minutes. In the example the order is standby and engineering, then non-scheduled, then downtime, then rate, then quality.
Then ask one question per loss before assigning an action. Was standby waiting for lots (upstream), for operators (staffing), or for a downstream tool (line balance)? Was the unscheduled downtime one long repair or many short stops, because the fixes differ? Was the rate loss a slower recipe, or stops shorter than the logging resolution that were recorded as productive time? Was the scrap concentrated in one lot?
OEE is a weekly or monthly summary. It is not a control chart, and a change of a few points between weeks is usually within the noise of how time was logged. Act on the loss ranking and on the trend over several periods, not on the single number.
Common mistakes
Logging standby as downtime. If the tool was capable of running and had no lots, that is standby. Putting it in downtime inflates the maintenance problem and hides the scheduling one.
Logging engineering as productive. Qualification and development runs produce no shippable units. Counting their time as productive and their wafers as output makes both the rate and the quality factors wrong.
Using a convenient ideal rate. An ideal rate set from last month's average guarantees a rate efficiency near 100 % and hides the speed loss. Use the design rate or the best demonstrated sustained rate.
Comparing OEE across tools with different denominators or different ideal rates. A 60 % tool and a 70 % tool may differ only in how their time is logged.
Chasing the factor with the lowest percentage. Convert to minutes first. The lowest percentage is not always the biggest loss.
Treating a weekly change of two points as a result. Check how the time was logged before concluding anything.
Using the calculator with this guide
The OEE Calculator takes the six state times, total and good units and the ideal rate, and returns OEE, the four factors, the three-factor view, actual and theoretical UPH, and the time sums. Enter the week above to reproduce the tables, then move minutes between states to see which change moves OEE most.
Sources and further reading
- Nakajima, S., Introduction to TPM: Total Productive Maintenance, Productivity Press, 1988. The origin of OEE and the three factors availability, performance and quality.
- De Ron, A. J. and Rooda, J. E., "Equipment Effectiveness: OEE Revisited", IEEE Transactions on Semiconductor Manufacturing, 18(1), 2005. The four-factor form (AE, OE, RE, QE) and the equipment-state basis used in this guide and in the calculator.
- SEMI E10 and SEMI E79. The semiconductor industry specifications for equipment reliability, availability and maintainability and for overall equipment efficiency. Referenced by name only; their definitions, state hierarchies and tables are not reproduced here.
This guide explains one consistent way to calculate OEE from a state log. It does not replace the definitions your site or customer has adopted.